GARDEN PAVILION STOAS
Wageningen
The housing project of 17 apartments along the Amstel River in Amsterdam started on site. On 9 September the first pile was placed. SIDstudio/4Construct is the structural engineer of parcel C1.
On 17-07-2014 the client Ruud Hartmans en Lieke Dorenbos organised a drink to celebrate the highest point of the Villa Schoorl.
The Children’s farm has a main (reception) pavilion with two shelters for animals. In June 2014 the construction of the two shelters is started. These shelters are founded on a new layer of ramped earth. The construction of the main building will start in the summer of 2014.
Architect Team-V asked Arjan Habraken (SIDstudio) to develop design concepts for the atrium roof for the Haga Hospital.
Multiple designs were made and presented in May 2013. Unfortunately the design scope could not be isolated from the overall structural contract already assigned for. Therefore these well appreciated designs are not further developed within this project.
On Friday April 4th 2014 the official opening of the Faralda NDSM Crane hotel Amsterdam took place.
The former NDSM crane 13 has now become a high-profile Amsterdam development: The 50 meter high object is an imposing appearance and has been realized in the well known and much-discussed former NDSM shipyard just near de border of the river IJ and the Amsterdam city centre.