Tensegrity roof Gelders Huis wins Nationale Staalprijs 2018
The tensegrity roof of the Gelders Huis has won the Nationale Staaltprijs 2018 in the category of ‘Karakteristieke stalen bouwdelen’ out of 29 submissions and 3 nominations.
The tensegrity roof of the Gelders Huis has won the Nationale Staaltprijs 2018 in the category of ‘Karakteristieke stalen bouwdelen’ out of 29 submissions and 3 nominations.
A new bicycle and pedestrian bridge in Sittard was completely lifted into place in the night of September 24, 2016.
The bridge evolved from the wish of the municipality of Sittard that wanted a new bicycle and pedestrian bridge over the train track at the location of ‘Bedrijvenstad Fortuna’. The bridge architect is Zwarts & Jansma Architects. SIDstudio created the sketch and preliminary structural design.
Three-star restaurant De Librije in Zwolle has received the Best Restyling award.
According to Thérèse Boer:
“It has been a big step for us to move to another building after 23 years and to renew the interior but the guests love it and logistics have improved enormously. The restaurant and kitchen now function as a whole. There is much more experience, emotion and oxygen.”
Today, the Volkskrant published a special article about the recently completed project Villa Schoorl. The architect, Studio Prototype, is being praised for extreme precision and attention to detail.
Villa Schoorl is a modern interpretation of a barn type farmhouse situated in a surreal dune landscape. Different functional volumes are sculpturally connected by a timber roof construction. The use of large glass facades at the open veranda creates openness and strengthens the villa’s relationship with its beautiful natural environment.
The front façade is made from rolled steel that has been treated against rust with a special coating developed by Dunia Coatings together with Studio Prototype. This transparent coating allows to show the mill scale of the steel creating unique aesthetics.
The Provincial Executive of the province of Gelderland has awarded the consortium iDNova the PPP project “Het Gelders Huis” on 15 January 2015. The project includes the design of a new office building in combination with the renovation of the monumental House of Province in Arnhem.
An ETFE / tensegrity atrium roof makes the inner courtyard the logistics centre point and lively heart of the building complex. The roof is designed by SIDstudio in collaboration Team V.
The Children’s farm is finished and opened his doors on 13-12-2014. After almost a year of building the urban farm Osdorp is now finished! There are animals, there is a neighbourhood vegetable garden, an herb garden and a vegetable garden for children.
The housing project of 17 apartments along the Amstel River in Amsterdam started on site. On 9 September the first pile was placed. SIDstudio/4Construct is the structural engineer of parcel C1.
On 17-07-2014 the client Ruud Hartmans en Lieke Dorenbos organised a drink to celebrate the highest point of the Villa Schoorl.
The Children’s farm has a main (reception) pavilion with two shelters for animals. In June 2014 the construction of the two shelters is started. These shelters are founded on a new layer of ramped earth. The construction of the main building will start in the summer of 2014.
Architect Team-V asked Arjan Habraken (SIDstudio) to develop design concepts for the atrium roof for the Haga Hospital.
Multiple designs were made and presented in May 2013. Unfortunately the design scope could not be isolated from the overall structural contract already assigned for. Therefore these well appreciated designs are not further developed within this project.