CONSTRUCTION DOME BASISWEG 10 IS STARTED

Last week Oostingh Staalbouw started to build the steel frame work of the 70m dome structure at Basisweg 10 in Amsterdam.
During the different building phases Fund Maatvoering b.v. will measure the locations of nodes. SIDstudio will analyse the coordinates and advise on actions to take to control the geometry of the dome during construction.